Uganda Rural Electrification Project - IG

Region
Eastern Africa
Sector
Energy
Scope
IG
Grant Amount
EUR 7,100,000
Total project cost
EUR 55,000,000
Status
Under disbursement
PFG Lead Financier
AFD

With an average of 75 kWh/year, Uganda has one of the lowest electricity consumption per inhabitant in Africa and a low access to electricity; the national electrification rate is estimated at 14% with the rural population having an even lower rate of less than 7%. Power shortage remains one of the greatest obstacles to the country’s economic growth.

The main objective of the project is to extend electricity from the national grid to local communities currently unable to access clean energy in order to spur improved economic and social development in a sustainable way. The project is therefore investing in infrastructure with a total Medium Voltage (MV) route length (33/11 kV) of about 1,500 km and a total proposed Low Voltage (LV) network (415/240 kV) of about 1,300 km with the necessary components of the system. To enhance the connection to this investment, the project will also support the strategy of increasing access through the provision of funds for the connection. the project is led by the Rural Energy Agency (REA). The total investment cost for the infrastructure project is about EUR 55.5m of which EUR 42.1m for the MV and LV grid extension costs and EUR 7.1m for the connection and 1.2 for technical assistance to REA.

The EU-AITF Investment grant (EUR 7.1m) will be used to finance the Last-mile Connection, within the area of the Project. The objective is to connect about 70,000 new clients.

12/2016